Case Study: Retrofitting Live Data Centres for AI Density While Upgrading Cooling, Power, & Operational Resilience

11:30 am - Wednesday 7th October 2026

  • Transitioning from air-to-water cooling architectures to support AI workloads above 20kW/rack while maintaining uptime during phased live-site migration
  • Upgrading floor PDUs from 208V to 415V to reduce cable losses, improve OEM server compatibility, and increase rack power capacity in operational environments
  • Coordinating secondary cooling redundancy, buffer tank integration, and operational readiness planning to reduce thermal, leak, and changeover risk before IT migration begins