REV Power Solutions

REV Power Solutions designs and manufactures custom electrical distribution equipment for mission-critical data centers applications across North America. Our capabilities include medium-voltage switchgear, low-voltage switchboards, unit substations, transfer systems, protection and control buildings, and fully integrated skid-mounted or modular power solutions. Supported by facilities in Calgary and Arlington, Texas, REV also provides qualified testing, commissioning, maintenance, arc-flash studies, and field services, delivering responsive, reliable power solutions from initial design through energization and ongoing operation across North America.

www.revpowersolutions.com

REV-Logo (ID 66571)
REV-Logo (ID 66571)